The use of cranes for a long time will inevitably lead to strikes. Therefore, cranes using Party A must pay attention to this issue. They must hire professionals in a timely manner to carry out an occasional inspection and maintenance of the crane. And to establish a related inspection and management system, which must have a specified period of time to monitor the crane, in the event of problems, timely processing to protect the stable operation of the crane. The following are four inspection time cycle specific maintenance content for your reference:

The first point of daily inspection.

The daily inspection is carried out by our driver personnel responsible for the simple maintenance of the crane and other related work. The main task is to clean the interior of the crane car, check whether the lubrication of the lubrication parts is rusted, and adjust the loose parts of the parts and fix the simple work. Drivers should always listen to the sound of cranes at work. Through the above simple routine inspection, the crane does not usually have too much problem in the work.

图片7_副本

The second point: check weekly.

The work of checking the cranes weekly is performed by the company's specially-deployed service technicians and drivers. In addition to the simple daytime inspections, they also need to observe whether the crane's paint falls off or whether the hooks are safe when the goods are removed. Stability, as well as a series of routine inspections such as clutches and brakes.

The third point: check monthly.

Check the crane equipment every month. This is a high-tech work, so the work pays special attention. The personnel of the company's equipment safety management department will come to inspect and at the same time mobilize technicians and drivers to assist in inspections. In addition to a general inspection of the above monthly inspections and daily inspections, they also have to pay attention to whether the power system inside the crane is normal. At the same time, the temperature of the crane machinery will also be tested. There are also abnormal conditions such as noise during crane operation. Only after understanding the crane's entire airframe's operational status can it be eliminated in time.

The fourth point: check every year.

Every year, the work of inspecting the cranes is completed by the company’s leading figures to organize and manage personnel. They mainly observe the maintenance expenses of the cranes, the operating status of the cranes, and the plans for mechanical renovations to make some changes and implementation.


Product name:CNC Machinery parts

Material:stainless steel 304,316,brass,copper,aluminum,carbon steel

Surface treatment:anodizing,polishing,powder coating,passivation,sandblasting,nickle plating,zinc plating,chrome plating,heat treatment.oxidation

Application:electronic,auto,electric appliance,electrical machine,toy,medical treatment,furniture

Equipment:CNC punching machine,CNC Milling Machine,CNC turning machine,CNC Machining center,automatic lathe,linear cutting,grinding machine

File format: solidworks,auto CAD,PDF,GPEG,DXF,IGS

 

FAQ:

Q1.What is your main products?
A1:Our main products are stamping parts and Machined Parts.

Q2. How to ensure that every process's quality?

A2:Every process will be checked by our quality inspection department which insures every product's quality. In the production of products,   

we will personally go to the factory to check the quality of products.
Q3.How long is your delivery time?
A3:Our delivery time is generally 30 to 45 days. Or according to the quantity.
Q4. What is your payment method?
A4:30% value of T/T in advance and other 70% balance on B/L copy.
For small order less than 1000USD, would suggest you pay 100% in advance to reduce the bank charges.
Q5.Can you provide a sample?
A5:Sure, Our sample is provided after receiving the tooling cost and courier fees.

CNC Machinery


CNC Machinery

CNC Machinery,CNC Milling Machine,CNC Lathe,Milling Machine

Baoding Henglian Mechanical Co.,Ltd , https://www.hengliancasting.com