In 2014, facing the unfavorable factors such as the slowdown in the growth rate of the power market, the drastic decrease in the average wind speed, and the severe situation of the wind curtailing and power curtailment, the company thoroughly implemented the spirit of the company’s annual work conference and the “15th Five-Year Plan” development strategy to comprehensively Advancing the “double promotion” work as the main line, taking benchmarking management as the starting point, endangering the crisis, failing to rely on and taking the initiative, at the beginning of the year, a conference call for new energy production and operation was held quickly, and the new energy units of the system were mobilized to accurately study the situation. Actively respond to challenges. In March, after the “double upgrade” of thermal power of the group company was deployed, Guodian Power started the “double upgrade” work of the new energy sector ahead of schedule, and held a “double upgrade” promotion conference and forum for new energy, and improved “new energy benchmarking management”. Work plan, formulate guidelines for the evaluation of new energy companies' operating indicators and the new energy implementation plan, through the benchmarking dynamic analysis mechanism, supervise and guide new energy companies to find problems with indicators, and to find gaps With measures as a guarantee, we will strive to create advanced regional development. Guodian Power has solidly carried out the activities of “contributing to electricity, reducing costs, and increasing profits”, giving full play to the role of remote centralized monitoring systems in assisting management, instructing grassroots units to carry out smart marketing, carefully governing equipment, rationally arranging inspection and maintenance, and improving wind turbines' power generation efficiency. Improve equipment reliability and economic operation level, laying a solid foundation for completing annual power generation tasks in advance.

As of December 26, Guodian Power's affiliated wind farms had completed a total of 5.591 billion kWh of power generation, completed an annual power generation mission five days ahead of schedule, and generated a record high for power generation.

CH/CS Main Shaft Assembly

CH/CS Cone Crusher


(1) CH/CS Cone Crusher is a single cylinder hydraulic structure. The equipment is designed according to heavy-duty working conditions. The main shaft is supported at the upper and lower points, and the stress conditions are good.


(2) The constant crushing chamber (CLP) design keeps the feeding and production capacity constant during the liner wear cycle, significantly reducing the operating cost.


(3) Up to ten kinds of cavity shape changes and up to four kinds of eccentricities can be set for an eccentric sleeve bushing, which greatly enhances the flexibility and adaptability of the equipment.


(4) Equipped with intelligent ore outlet adjustment system ASRI, the performance of the crusher can be maximized.


(5) Advanced liner wear monitoring and automatic compensation functions, operation data record query functions, and convenient network communication functions can significantly improve the maintenance level of equipment and optimize the coordination and control with other equipment in the system.


(6) Compared with CH type, CS type crushing chamber is higher and steeper, with larger feed inlet and larger carrying capacity. It is suitable for secondary crushing when the feed particle size is large. Its lower frame is interchangeable with CH crusher of the same specification.

Ch/Cs Main Shaft Assembly,Indispensable Retaining Ring,Important Retaining Ring,Hot Sale Retaining Ring

Shenyang Ule Mining Machinery Co., Ltd , https://www.ulecrusherparts.com